Chapter 28-25. Boiler Inspection and Pressure Vessels
Section
28-25-1Definitions.28-25-2[Transferred.]28-25-3Chief inspector.28-25-4Authorized inspectors.28-25-5Administration and enforcement.28-25-6Method of inspection.28-25-7Access to boilers and pressure vessels — Time of inspection.28-25-8Orders to cease operation or repair.28-25-9Formulation and adoption of codes, rules, and regulations.28-25-10Inspection and certification of boilers — Permit to install — Notice, report, and standards for alterations and repairs — Minimum standard.28-25-11Issuance of certificate — Period of validity — Display.28-25-12Inspection fees.28-25-13Reports by authorized inspectors — Certificate — Defective boilers.28-25-14Request for board hearing.28-25-15[Repealed.]28-25-16Penalty for violations — Complaints.28-25-17Judicial enforcement.28-25-18Exemptions.28-25-19Inspection of unfired pressure vessels being manufactured.28-25-20Reports to general assembly and governor.28-25-21Local ordinances void.28-25-22Severability.28-25-23Relief from personal responsibility.